300 acre of industrial space for assembling and building JCB’s machinery provided with Testing track and Research facility. Scope involves Transportation and Site Planning.
Apparently we had reached a great height in the atmosphere, for the sky was a dead black, and the stars had ceased to twinkle. By the same illusion which lifts the horizon of the sea to the level of the spectator on a hillside.