Preparation of Detail Project Report for the work of construction of Grade separator at km 80/7 in Chennai-Thiruthani - Renigunta road (NH 205) at Korattur.
Carrying out Engineering studies, field surveys and investigations including traffic surveys to determine the Feasibility of providing a Grade separator required for catering to future traffic over design period.