Preparation of Design and Drawing including Bill of Quantities (BOQ) for the proposed Demolition and reconstruction of ROB at Elephant Gate Road.
Junction Improvement for the Intersection, two way roads is converted into four way road. Design Feasibility Report preparation which includes GAD preparation, Technical specification and Drawing.